This post has been merged into Risk review
This post has been written about in our changelog:
4
Adding Existing Risks to a Risk Review
Next (Under Consideration)
D
david.higginson@culturatech.com

There are currently 2 options to add Risks to a Risk Review 1) A User Defined Risk; 2) Importing all risks from a Risk Library. However, in the latter case some of the Risk Libraries contain up to 70 risks. Hence it's time consuming to add an entire library and then have to exclude the risks which aren't needed. Hence it would be more efficient to have a 3rd option where a user could search within all the libraries for a specific risk e.g., Flooding and add this in isolation.

Comments
L
Louis
Apr 26, 2023
Set the status to
Next (Under Consideration)
0